Design the review step first
Most teams add a review step after a pilot goes wrong. We design it first, and it’s the main reason our pilots reach production.
Written by
Pablo Ortega
Published
Read time
2
min read

When a team describes the system they want, they often say “fully automated, with human review at first”. The review step is pictured as scaffolding, to come down once the model is good enough. We design it the other way round: as the part of the system that makes everything else trustworthy.
What a review step actually does
A good review step does four jobs at once.
It catches errors before they matter. Obvious, but it’s the only job most designs plan for.
It teaches the model. Every correction is a labelled example of an edge case. Over months, the corrections are the most valuable dataset the business owns.
It keeps accountability clear. Regulators, customers and boards want to know who decided. “The model” is not an acceptable answer, and under rules like UK GDPR’s provisions on automated decision-making it may not be a lawful one.
It earns trust. People adopt a tool they can overrule. Remove the ability to say no, and they’ll find other ways to route around it.
Designing it well
Most review steps fail because they are bolted on. We design them alongside the model, in the sprint:
Review the exceptions, not everything. If people check every output, you’ve built a slower process. The model should say how sure it is, and only the unsure cases go to a person.
Put it where people already work. A queue inside the claims platform, a flag in the onboarding checklist, a column in the buying spreadsheet. Not a separate tool.
Show the reason. Reviewers decide faster and better when they can see why the model suggested what it did.
Name the reviewer. Every decision logged with who made it and when. It turns an audit into a report you can print.
Measure the reviewers too. Overrides that turn out right are a sign of a healthy system. A reviewer who never overrides may have stopped reading.
The numbers
On our last six pilots, between 4% and 15% of cases went to review once the system settled. That’s the range where the saving is real and the review load is manageable. Below it, we start asking whether the threshold is too loose; above it, whether the use case was the right one.
When review can come out
Sometimes it can, for parts of the work where the cost of an error is low and accuracy has been stable for months. We make that decision with the owner, in writing, and keep monitoring in place. In regulated decisions (claims, care, pay) we recommend it stays. That’s not caution for its own sake. It’s what lets the system stay in production.